TimeItemWhoNotes
AdminTim
  • Earthdata Wiki Space for collaboration
  • Coordination Schedule
    • Boon: CDR rescheduled for Mid may, need to show plan/strategy for ingest.
      • For CDR, sufficient to show high-level description of ingest/handoff
      • EIS testing and system testing, end-to-end testing with Metadata in October/November timeframe
    • Boon: attempt a test data delivery, L0 data may be ready, possibly in June/July timeframe
      • Need to speak with Erin Wagner
    • delivery cadence anticipated to be daily. 
      • 4 deliveries daily planned from instrument to processing
    • 60 Days until next meeting


ASDC


PREFIRE
  • Requesting best practice 
  • What is the preferred ingest protocol?
    • Lindsay - Karen Brown will provide keys for drop box access.  We will want sample files at ASDC.
  • Boon: can we look at sample data?
    • PREFIRE may want additional viewer/sub



  • Lindsay: Some of the granule sizes were noted to be too large. The ICD says that L2B flux granules are 20.5GB. Granules are recommended to be 4GB
    • @Boon Lim will investigate
    • Larger files slow ingest process

Action items

  •