| Hazem Susan Joe Rollins | Alex Erin Mary | Discuss worldview projection. The team received science data and TLM data. Expected date of data ingest in July after PLAR | Erin to send remaining keywords. |
| Hazem Susan Joe Rollins | Brian Dourin Tim Michael Susan H Ingrid G | Brian: Expecting Instrument data after the second Launch. Erin sent the Abstract/Keywords revision this morning. Erin is working on USER GUIDES. |
|
| Hazem Susan Alex Lisa | Chris H Tim M Peter P Erin | There is a change in the launch date to May 22nd Preparing for ingest
|
|
| Ingrid G Hazem Susan H Alexander R Lisa C Tonya G | Tim M Chris H Peter P Erin | Update UW data contact with working Email since provided mailbox is not a working address.
Erin: Is this your login = epwagner What is the latency? Information for GIBS
| |
| Ingrid G. Erin Hokanson Wagner Tim M | Metadata Discussion in MMT: Temporal Keyword:
Spatial Coverage:
Horizontal resolution
Location Keywords:
|
| |
| Hazem M. Susan H Ingrid G Alex R. Chris H. Susan H. Jacob C. | Erin Brian Drouin Tim Michaels Peter Piatko Joey Rollins | Metadata (Ingrid):
Brian: Next week we will have a more official dates Hazem: Uploaded the ATBD Erin: We are writing Dataset User Guides. Ready Mid-April |
|
| Hazem M. Susan H JC Paz Ingrid GS Chris H Alexander R Caroline Downey Lisa C Tal G | Jacob Craiglow Mary L White Erin Tim Michael | Mary: We are passed the review; working on transportation planning; working on gaps; everything on schedule. Launch: May 13th and June 2nd Erin: No big updates on our end. Working on Browser images. Working on Release Target Date. Hazem: As we get closer, we can determine the date. Hazem: When are you able to send the ATB and User Guide? Erin: They are not finalized, but we can send them. -Before Launch. Hazem: We are moving 26 collections to PROD. Do we need to edit anything in the metadata? Erin: I will check Tim: R01 is the first. R00 was only testing. Alex R: How realistic are the data files? Erin: The synthetic data is realistic; they only miss the instrument noise. | |
| Natalie N. Pressley Alexander P. De Luca Minnie Wong Ryan A. Boller Angela W. Li Micah Thorstenson | Hazem A. Mahmoud Christopher K. Howard Peter J. Piatko Joey Rollins Alexander Radkevich Ingrid Garcia-Solera | GIBS Team Meeting to discuss HyBIG Description: The Harmony Browse Image Generator (HyBIG) supports the conversion of GeoTIFF inputs to Global Imagery Browse Services (GIBS) compatible PNG or JPEG outputs. This includes, where necessary, conversion to a GIBS-supported Coordinate Reference System (CRS). Other projections can be requested, but they will not be compatible with GIBS. We want to see if the output is ingestable by the GIBS team. Experience with HarmonyPy?
Update GIBS ICD as we do for our published datasets Add Polar to the ICD GITC-4865 - Authenticate to see issue details One product for now and making sure that HyBIG is meeting requirements Global mosaic. Every collection of 3 files is one orbit/1cubsat GIBS PI Planning is: 2024.2 testing (April 6 - June 24) and 2024.3 and 2024.4 in Production |
|
| Please bear in mind that multiple abbreviations were used, most of them I saw for the first time. If you ask me what they are - I have no clue. Ann D started the meeting at 10:18 Ralph Basilio presented the Independent Review Team Introduction and Instructions. Mary White presented Project Status Overview. Key points: Project organization is moving from phase D to phase E; transportation planning review met success criteria; awaiting approval from the NZ Space Agency which is expected to arrive within 3 weeks; launch dates are May 13th and June 2nd (ET, next days local time, the dates were repeated in several other presentations); critical point - 2nd stage of the rocket. Erin Hokanson was talking about Playback code readiness. Steve Stem presented the Blue Canyon Technology report on the satellite/sensors readiness. Both Flight Systems are OK. Karen Dragon(?) was talking about Certification of Flight Readiness. Everything is OK there too. Identified risks are BCT sidekiq board, transportation, and battery thermal runaway. However, PREFIRE CubeSats are ready for launch. Liam Cheney presented launch vehicle readiness report. Timeline of shipments was presented. Bottom line - launch service preparations are on schedule. William Jones-Wilson presented safety status report. All 23 P/FRs are closed. There is 1 red-flag P/FR during the mission. Risk assessment - medium risk and ready to proceed. Tristan L'Ecuyer mentioned ASDC saying he contacted us and ASDC is ready to process PREFIRE data. This concluded the first part. | |||
|
| |||
|
| |||
| Significant compression in the netcdf files. May 1st and 15th. Launch dates. ~April for shipping instrument . Jan 31st Feb 1st ORR/MRR. | |||
| UAT access Erin 24 collections published ORR January UMM-G and UMM-C thumbnail Blue Canyon fixed the radio Delta pre ship review January 9th January 31st and February 1st Rocket Lab figured out the launch failure and they will launch again for the end of November New Zealand May 1st and May15th | |||
| Radio Fm1 for the end of the month . pre ship review early January Rocket lab design review May 1st to May 15th They have some slack in the launch schedule. Collections moving to UAT | |||
| I identified the radio problem and rocket lab have mission integration meetings group on weekly basis. May 1st and 15th MLTANS plane 12 hours apart. Mean local time ascending node mission specific review October 5th next meeting Bugs for MMT UMM-VAR issues Tim is waiting to update granule metadata Tim has a long meeting with software engineer for launch operations test L1B with more simulated data test L2 Cloud mask | |||
| bug for Tim's code. rocket lab may 1st and may 14th NEW ZEALAND https://www.nasa.gov/press-release/nasa-announces-launch-service-for-arctic-warming-experiment https://www.nasa.gov/press-release/nasa-announces-launch-service-for-arctic-warming-experiment Split the polygon Rocket lab deliverable May 1st or May 15th. They want to push it earlier to April. We need a feature for PREFIRE GIBS. L3 is the first data to test GIBS imagery. AUX is the next in Testing. radio issue still existing. Rocket lab front has a launch failure was Tuesday. May1st still the current date. Erin has some AUX met | |||
| rocket lab may 1st and may 14th NEW ZEALAND https://www.nasa.gov/press-release/nasa-announces-launch-service-for-arctic-warming-experiment https://www.nasa.gov/press-release/nasa-announces-launch-service-for-arctic-warming-experiment next meeting September 7th Split the polygon Rocket lab deliverable May 1st or May 15th. They want to push it earlier to April. We need a feature for PREFIRE GIBS. L3 is the first data to test GIBS imagery. AUX is the next in Testing. | |||
| rocket lab may 1st and may 14th NEW ZEALAND https://www.nasa.gov/press-release/nasa-announces-launch-service-for-arctic-warming-experiment https://www.nasa.gov/press-release/nasa-announces-launch-service-for-arctic-warming-experiment next meeting September 7th | |||
|
| |||
|
| |||
| Same as previous meeting | |||
|
| |||
|
| |||
|
| |||
|
| |||
|
| |||
|
| |||
|
| |||
| ||||
| ||||
| ||||
| ||||
Updates 12/8/2022
| ||||
| ||||
Date | Attendance | Notes/Discussion | To-Do |
---|