Date | Artifact | POC | Notes | Action Items | <add rows as needed>||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
10/1/2021 |
| This feature was requested by ESDIS and the most desirable solution was to leverage a new version of the Earthdata Access application. |
Date | Notes | Action Items |
---|---|---|
| SIT DNS cutover | |
| UAT DNS cutover | |
| Prod DNS Cutover<add rows as needed> |
...
Name | Role | Notes | Action Items | |
---|---|---|---|---|
Mark Reese | Product Owner | mreese@element84.com | ||
Ryan Abbott | Technical POC | ryan@element84.com | ||
Operations POC | ||||
Security POC | ||||
<add rows as needed> |
...
Validation Item | Completed (Y / N) | Reference Artifact, Link, or Comment if needed | Notes | Action Items |
---|---|---|---|---|
Has application team conducted end-to-end testing within the EDC and confirmed existing EDC services are sufficient to meet application needs? | Ongoing | Experiencing a timeout at the moment, continuing to debug. | ||
Has application team confirmed that existing in-cloud networking (ex: NGAP managed App-VPC) is sufficient to meet application needs? | ||||
Has application team conducted network connectivity testing for any data ingest flows and confirmed existing ingest options are sufficient to meet application needs? | N/A | |||
Has application team confirmed that system administrator connectivity options are sufficient to meet application needs? | <add rows as needed>Y |
NGAP References:
...
Validation Item | Completed (Y / N) | Reference Artifact, Link, or Comment if needed | Notes | Action Items |
---|---|---|---|---|
Has the application team conducted network connectivity and performance testing for any data egress flows and confirmed existing egress options are sufficient to meet application needs? | ||||
Has the application team conducted testing to ensure application continues to operate while in a bandwidth throttled mode? (not mandatory but recommended for high volume S3 distributors) | N | |||
Is application team aware of AUTOMATED egress related cost monitoring, alerting, and enforcements?
| ||||
Have both application team and platform team received approved egress cap and throttling threshold values from ESDIS? | ||||