DOIs / Dataset Landing Pages / User Guides / Tutorials / Announcements through comms teams / Approach to advertising at conferences / is everything required for open science published / etc?
UI Tab
title
Technical Factors
Technical Factors
This list of factors can impact enterprise applications, please keep this list up to date so that enterprise teams can evolve the systems and cost projections as needed. Changes in this list should trigger re-evaluation by corresponding trains.
None, per ICD ("The PREFIRE project will have a backup of all data that is needed for reprocessing and will not be dependent upon the DAAC to provide this data. There will also be a second backup for this data at the University of Michigan (transferred via SDTP) for the duration of the mission.")
ORCA, EDC
N
LZARDS Integration
None, per ICD ("The PREFIRE project will have a backup of all data that is needed for reprocessing and will not be dependent upon the DAAC to provide this data. There will also be a second backup for this data at the University of Michigan (transferred via SDTP) for the duration of the mission.")
LZARDS
N
Hi-Res Imagery
Organization responsible for generating the imagery: GITC
Pathway for submission to GIBS: Cumulus Task + HyBig → GIBS? YES
How will this mission comply with the Levels of Service Policy? Which transformation services will be needed for the data? (Note: This is a complex answer, please link to a separate document as neeeded)
List code that needs to be developed specifically for this mission (e.g. ingest adapters, new Cumulus tasks, new transformation services, etc.)
HyBIG calls and SDTP
Varied
UI Tab
title
Mission Requirements Traceability
Requirement Traceability
The table below summarizes the requirements for ESDIS as a part of this mission. Of note, the team designated 'Responsible Team' is the one ultimately responsible for validating this requirement.
Source
Text
Responsible Team
Implementation Approach
Status
423-IPA-016, Rev A
Provide the ingest, archive and distribution of the PREFIRE data via ESDIS/ASDC.
ASDC
Standard: Ingest/distribution via Cumulus/TEA. Discovery via CMR.
Done
423-IPA-016, Rev A
Archive and openly distribute all standard data products and corresponding metadata, scientific source code for algorithm software, coefficients and ancillary data used to generate these products during routine operations. Public release of these data shall conform to the NASA Earth Science Data and Information Policy.
ASDC
Standard: Ingest/distribution via Cumulus/TEA. Discovery via CMR.
Done
423-IPA-016, Rev A
Lead the development and maintenance of an ICD between PREFIRE SDPS and ASDC.
ASDC
ASDC to implement and maintain ICD
Done
423-IPA-016, Rev A
Implement the system interface to obtain PREFIRE forward processed and reprocessed data from PREFIRE SDPS in accordance with the established ICD between PREFIRE and ASDC.
ASDC
Cumulus will pull data from PREFIRE SDPS using the SDTP (HTTPS) interface
Done
423-IPA-016, Rev A
Capture archive and distribution metrics using the EOSDIS Metrics System. Make these metrics available to the PREFIRE Project.
ASDC
Standard: Cumulus to Cloud Metrics to EMS
423-IPA-016, Rev A
Lead the development and maintenance of Product User Guide documentation and other associated dataset documents. Make these documents publicly available to users.
ASDC
Where are these posted? ASDC website? Linked via CMR metadata?
These documents are still v0 draft. We will post v1 on ASDC website.
Yes, the links below are from S3 bucket for documents, and they are added to CMR UAT UMM-C collection as a related URL - Hazem
Provide and maintain Digital Object Identifiers (DOIs) for PREFIRE data products.
ASDC
Standard: Generate DOI, linked to landing page, and provide via CMR metadata
423-IPA-016, Rev A
Support the PREFIRE Project in defining the format and content of the metadata associated with all of the PREFIRE standard data products.
ASDC
423-IPA-016, Rev A
Support the PREFIRE Project by testing all interfaces between the PREFIRE SDPS and the ESDIS/ASDC including the ingest and distribution of simulated data sets.
ASDC
423-IPA-016, Rev A
Lead the development of an Appendix to the Network ICD (Reference Document 423-ICD-002) that specifies the network requirements to support forward processing and reprocessing for the mission lifetime.
ASDC
423-IPA-016, Rev A
Participate in major PREFIRE Project Reviews as requested by the PREFIRE Project and defined in the PREFIRE integrated schedule.
ASDC
Ongoing
423-IPA-016, Rev A
Support the PREFIRE SDPS in the identification of the end-of-mission artifact collection for the long-term archive of the PREFIRE datasets. Provide the long-term archive for the artifacts and data.
ASDC
Ongoing
423-IPA-016, Rev A
Provide User Services and assist data recipients with information related to archive and distribution functions.
ASDC
Ongoing
423-ICD-026
ASDC supports the delivery of science and metadata files via the HTTPS requests defined by the Science Data Transfer Protocol (SDTP).
The subscriber requests the file contents by performing a HTTPS GET containing the fileid.
The provider returns the file contents.
The subscriber acknowledges the file transfer by performing a HTTPS DELETE containing the fileid of the file, and the provider records this acknowledgement.
The provider removes the file from the queue for the subscriber and returns a HTTPS Success status.
ASDC
Done
423-ICD-026
Per the request of the PREFIRE project, the ASDC will maintain the most recent version (for each independent product) in its archive
ASDC
Ongoing
UI Tab
title
ESDIS Checklist
ESDIS Checklist
... coming soon... the list of all the things we must do inside ESDIS to meet the ADURD / adhere to policy / etc. This would be used both to make it easier to not skip any steps when implementing, but also as a 'gate' so that we can all agree ESDIS is ready for various phases in the mission lifecycle. Ideally it will come with easy 'compliance checkers', for example something like 'run this command on your CMR metadata to validate that all best practices are adhered to'.
UI Tab
title
Decision Register
Key Decision Register
Document any key decisions, especially those that may result in deviation from ESDIS requirements or architecture or have schedule or cost implications.
Criteria
Options Considered
Option Selected
Approval Details
(include date, location and approver name/role. e.g. OB DAAC ERG, 10/31/2023, Ted Sobchak ESDIS PM)